Egoin constructed the main stand of Zarautz Rugby pitch (Gipuzkoa) using large span laminated timber beams. The project included two grandstands built in two different phases, the first of 45 m2 and the second of 100 m2.

Productos

Detalles

  • Periodo de construcción

    2019

Equipo de trabajo

Promotor
ZARAUTZ COUNCIL

Cliente
LAGUNKETA

Ingeniería Egoin
ALVARO RUIZ DE ARCAUTE

Comercial Egoin
UNAI GORROÃ?O