Egoin constructed the main stand of Zarautz Rugby pitch (Gipuzkoa) using large span laminated timber beams. The project included two grandstands built in two different phases, the first of 45 m2 and the second of 100 m2.
Productos
Detalles
-
Periodo de construcción
2019
Equipo de trabajo
Promotor
ZARAUTZ COUNCIL
Cliente
LAGUNKETA
IngenierÃa Egoin
ALVARO RUIZ DE ARCAUTE
Comercial Egoin
UNAI GORROÃ?O